Property Information

Southcenter Shopping Center

123 Coastal Ave Los Angeles, CA 90405

Mission Statement

Located at the busiest interchange in the state of Washington, in a dense and affluent market, Westfield Southcenter is a shopping powerhouse that dominates Seattle’s south end, offering an aspirational retail collection, a broad restaurant offering, and popular entertainment.

Contact Sheet

Center Information

General Manager Name
mail@abc.com
+1234567
General Manager Name
mail@abc.com
+1234567
General Manager Name
mail@abc.com
+1234567
General Manager Name
mail@abc.com
+1234567
Property Address
Westfield Corporate
123 West Field Street
City, ST 90012

 

Delivery Address
Westfield Corporate
123 West Field Street
City, ST 90012

Southcenter Images

Text about the displayed image….Lorem ipsum dolor sit amet et delectus accommodare his consul copiosae legendos at vix ad putent delectus delicata usu. Vidit dissentiet eos cu eum an brute copiosae hendrerit. Eos erant dolorum an. Per facer affert ut. Mei iisque mentitum moderatius cu. Sit munere facilis accusam eu dicat falli consulatu at vis. Te facilisis mnesarchum qui posse omnium mediocritatem est cu. Modus argumentum ne qui tation efficiendi in eos. Te facilisis mnesarchum.

Design guidline

  • Storefront Height – Varies (13’-6’ to 15’-6” depending on zone requirement)
  • Glass Height – Varies depending on zone requirement, low-iron glass
  • Glass Door Height - Exact height (10’)
  • Design Control Zone – Entire sales floor
  • Transparency Percentage - Exact number (80% glass, 20% opaque).
  • Signage Height - Exact height or range (16” max height signage, face-lighted no trimcap, reverse channel halo or illuminated push through letters)
  • Blade Signage – Varies depending on zone requirement
  • Window Signage - 2” frosted 3M film applied to inside face of window.
  • Bulkhead Conditions – Tenant to maintain storefront heights with tenant finishes per zone requirements, mall bulkhead conditions to be preserved
  • Neutral Pier Conditions – Depending on location, existing or new to mall criteria per zone

Original Mall

  • Mechanical – Tenant dedicated independent unit either RTU or PAC unit.
  • Electrical – 120/208 volt, 3 phase, 4 wire
  • Smoke Evac – None.

2008 Development

  • Mechanical – VAV, Landlord provides conditioned supplied air.
  • Electrical – 277/480volt, 3 phase, 4 wire
  • Smoke Evac – None. Though, tenant connected via fire alarm.
  • Standard length of process - Permit time is average 8 -12 weeks.
  • Need Landlord approved drawings to submit? - Yes
  • Precon is required – Tenant GC to set up meeting with Facilities Director prior to construction start. All permit, insurance, paperwork in hand.
  • GC required for permit issuance - Yes
  • GC Labor Requirement – None

Floor Plans

Additional Information